Residential and Mixed Use
Technical context / 06

Repetition and variety coordinated in one building.

Residential and mixed-use projects require continuity across units, vertical distribution, shared areas, and systems serving different functions.

ARILVO / SECTOR
06 / 06
Units and risers
Shared space · Interfaces
Typical priorities

Coordinate repetition without losing the exceptions.

Unit types, uses, and project standards must be confirmed before models and documentation are defined.

01
Repeatable units
Organise typical solutions while keeping variants, alignments, and connection points readable.
02
Risers and shafts
Coordinate vertical distribution, penetrations, and relationships with the served units.
03
Mixed-use interfaces
Distinguish systems, common areas, and transitions between functions with different needs.
Coordination field

From the repeated module to whole-building distribution.

The model connects units, risers, and common zones while keeping variants and decisions visible.

06 / 06
01

Types and uses

Align units, common areas, and approved criteria.


02

MEP distribution

Develop floor networks, risers, and connections between zones.


03

Variant control

Review repetitions, exceptions, and multidisciplinary interfaces.


04

Consistent deliverables

Align models, plans, and schedules with agreed configurations.


Possible outputs

Deliverables that connect units, risers, and uses.

Delivery is structured around the phase, unit types, and defined responsibilities.

01
MEP models for units and common areas
02
Coordinated building-services plans
03
Riser diagrams and vertical distribution
04
Schedules and typical-configuration views
Sector consultation

Coordinate the system from module to building.

Share unit types, uses, phase, and required outputs so we can define the technical support.